News News
Products / Products
  • Time: 2016 - 01 - 13
    Duna White/Italy WhiteStar white marble also calls Italian white marble, it is the white stone material that just appears in recent years. The plasmids are watery, pure and transparent with straight lines. Can say the nova that is white stone material, from roll out to popular use cycle is very short, development is very swift and violent. High quality, its advantages of weathering, not easy to corrosion, durable, beautiful, natural harmony is suitable for the resort, tourist attractions, hotels, office buildings, Banks, squares, gardens, villas and other buildings decoration. The feeling afte...
  • Time: 2016 - 01 - 13
    Chinese name: China coffeeAs an English name, Chinese EmperadorPlace of production: jiangxiColor: brownLithology: domestic marbleBrown nets - natural marble plank for high surface decoration materials, mainly used in architectural decoration of high grade buildings, such as used as memorial building, hotel, exhibition halls, theaters, shopping malls, libraries, airports, stations, indoor metope of large public buildings, the place such as cylinder, floor, stair step facing material can also be used in the stair rail, desk, front, dado, window sill, skirting boardCompressive strength: 166.5mpaF...
  • Time: 2016 - 01 - 13
    White JadeStraight and striped white jade is one of the most popular stones in jade. It is not as showy as other jades and is limited to local use. White is taking the deposit of golden yellow inside, the stripe grain of bedding face law, make it can bedding face adornment and do not appear hyperbole. The high-end jade style makes its projects as luxurious as a palace. One or two streaks across a block of jade are common, but such large, regular streaks are rare. Structured, texture patchwork like blue sky and white clouds, more like the waves of undulating water. Smooth to the touch, bright a...
  • Time: 2016 - 01 - 13
    Natural marble plate for high finishing materials, mainly used in architectural decoration of high grade buildings, such as used as memorial building, hotel, exhibition halls, theaters, shopping malls, libraries, airports, stations, large public buildings, indoor metope, the place such as cylinder, floor, stair step facing material can also be used in stair railing, desk, front, dado, window sill, skirting board, etc. Our company has a long-term and stable cooperation with Turkish mines, which can help ensure the quality of stone and market demand.
Contact Way

Contact Number:0592-5626018

Fax:0592-5626018

E-mail:young@changyip.com

China · xiamen · headquarters

Address: yindu square, Haitian road, huli district, xiamen city

Nan recently delineated three mining economic zone, early know early benefit

Time: 2019-04-15
Click: 21

Recently, nan 'an issued the notice of the overall plan for mineral resources of nan 'an (2016-2020).


Approved by the reply of quanzhou municipal people's government on the general plan of mineral resources of four counties (cities) including nan 'an, issued by quanzhou municipal people's government in document [2018] no.165, it is open to the offices of people's governments of towns (streets) in nan 'an, xuefeng development zone, administrative committee of economic development zone and relevant units directly under the city.


The scope of application of the plan is the administrative region of nan 'an, and the object is the mineral species distributed in nan 'an listed in the annex of the implementation rules of the mineral resources law of the People's Republic of China. The plan is based on 2015, with 2016 ~ 2020 as the planning period and looks forward to 2025.


There are these points in the document, stone people should pay attention to:


Guiding ideology and basic principles


With the goal of accelerating the construction of ecological civilization pilot demonstration area, with the transformation of mineral resources utilization mode as the main line, with the reform and innovation as the driving force, adhere to the principle of green mining and circular economy, the construction of resource-saving and environment-friendly ecological civilization demonstration area; We will give high priority to ecological and environmental protection and focus on developing green mining and the circular economy.


To effectively prevent and control geological disasters, soil erosion and 'three wastes' pollution caused by the exploitation of mineral resources.


Unified planning, moderate concentration, strict control of the layout and number of construction stone mines, promote zero-emission production and ecological environment restoration in mining areas


Planning and objectives


Recent (2016-2020) planning objectives:


1. Geological survey and mineral exploration


100% geological exploration of existing mines will be completed to provide geological basis for continuous development and utilization of mines or rectification. To verify the reserves of mineral resources.


2. Exploitation and utilization of mineral resources


The total number of mines in the city shall be controlled below 12, all of which are stone mines for construction. The total amount of gravel mining shall be controlled below 2.8 million cubic meters per year, and the proportion of large and medium-sized mines shall be maintained at 100%.


We will improve the technology for mining and processing mineral resources and raise their scientific and technological content.


3. Protection and control of the geological environment in mines


The recovery and control rate of geological environment in mines left over from history reached 45%, and 100% of new (expanded) mines were built and mined.


As soon as geological disaster sites in mines are discovered and treated in a timely manner, the occurrence rate of secondary geological disasters in mines will obviously decrease, and the total discharge of pollutants in major mining areas (mines) will conform to the total emission control targets set by the provincial and municipal governments.


4. Reform and innovation of mineral resources management


To introduce the system of joint meeting of mining right transfer and implement the system of mining right auction in principle;


The price shall not be lower than the provincial benchmark price, and the method of net transfer of mining rights shall be explored. Curb illegal mining, destructive mining and other illegal activities.


Key mineral development area


According to the metallogenic geological conditions, distribution rules of mineral resources and regional economic development, three mining economic zones were defined in the city.


Fengzhou stone mining and mining economic zone: with an area of 4.3652 square kilometers, there are 5 stone mines for construction in the area.


The annual output of ore is about 600,000 cubic meters, and the mining output is about 30 million.


Shuitou stone processing and mining economic zone: with shuitou town as the center, it has more than 1,350 stone processing enterprises and 233 over the scale.


In 2015, it produced more than 97 million square meters of decorative stone with an annual industrial output value of about 15 billion yuan. Industrial output is expected to reach 20 billion yuan in 2020 and 25 billion yuan in 2025.


Designated mining area


In order to minimize the environmental disturbance and damage caused by sand, stone and soil mines used for construction, the development and utilization of stone materials used for construction in this city were planned and distributed, with 9 permitted mining areas and 3 alternative mining areas demarcated.


(1) mining areas are permitted


Set 9 allowable mining areas (SC01 -- SC9) :


Fengzhou town taoyuan village mountain heart east, guanqiao town lingdou village, hongse town kuixing village, hongse town bastian village, shishan town sound east village water gold dam, guanqiao town guankeng village within the village liao gong shan, fengzhou town big zhong shan, guanqiao town tianluo mountain, dongtian town qinshan.


In principle, no new mining right shall be set up in the mining area during the planning period, except for the mining right set out in the plan.


(2) alternative mining areas


Three alternative mining areas for temporary ore use are set up (SC10 -- SC12), among which no. 2 xiaoguangshan town, shijing town, is the machine-made sand (column 4).


The three alternative areas are all located in yuanqian village of shijing town, namely: mianhu mountain of shijing town, xiaoguangshan no.1 of shijing town, and xiaoguangshan no.2 of shijing town.


It is designed to provide 90 million cubic meters of earth and stone for the reclamation of xiamen xiang 'an airport and nanan strait eco-tech city.


Promote the construction of green mines


1. To complete the construction of this city's green mining demonstration zone by 2019, basically establish the green mine standard system and management system, and study and issue supporting incentive and restraint policies for green mine construction.


2. By 2020, a green mining pattern will be basically formed. Over 70% of the large and medium-sized mines in the city will basically meet the green mining construction standards.


3. By 2025, more than 80 percent of the city's large and medium-sized mines will have reached the standard for green mine construction, the level of resource conservation and intensive utilization will be significantly improved, the mine environment will be effectively protected, the level of land reclamation in mining areas will be comprehensively improved, and mining enterprises will develop in harmony with local governments.


General requirements:


Adhering to the principle of 'development in protection, protection first, protection in development, protection first', in accordance with the requirements of 'ecological province' construction, the establishment of resource-saving, environment-friendly mining enterprises.


It is important to control the environment of open-pit mining mountains, minimize the damage and pollution caused by mining activities to the ecological environment, and prevent secondary geological disasters in mines.


Ensure that during the planning period, the city's mining ecological environment has improved significantly, mineral resources development and ecological environment protection have become more and more coordinated, and the economic, social, resource and environmental benefits of the mining industry have gradually reached an organic unity.


Hot News / News More>

Tell me your requirements, and submit your content we will contact you the first time!

Address: yindu square, Haitian road, huli district, xiamen, China Tel:+0592-5626018
Copyright ©2019 - 2025厦门振烨进出口有限公司
犀牛云提供企业云服务
X
3

SKYPE 设置

4

阿里旺旺设置

2

MSN设置

5

电话号码管理

  • 0592-5626018
1

QQ设置

6

二维码管理

8

邮箱管理

展开